THINGS ARE MOVING ALONG AT THE PELICAN POINTE
CLUBHOUSE. PP II AND UMBRELLA BOARDS ARE ANXIOUS TO RETURN TO THEIR OFFICES FROM WORKING OUT OF THEIR HOMES. THE FIRE INSPECTOR
REQUIRED SHEETROCK CEILING ABOVE THE ACOUSTICAL DROPPED CEILING THAT WILL BE
No comments:
Post a Comment