BELOW TRUCKLOAD OF PLYWOOD AND OTHER MATERIALS ARRIVES BEFORE 6:30 A.M. JULY 21st, ON ESTUARY WAY, FOR THE DAY'S WORK.


BELOW, LEFT 9660 ESTUARY HAS LOWER FLOOR GABLE END WALL SHEATHED IN PLYWOOD AND UPPER FLOOR BALLOON FRAMING HAS BEGUN.
THE BATHROOMS WERE LATER SHEATHED WITH PLYWOOD AND TIED INTO THE BALLOON WALL STRUCTURE
FOR ADDED STABILITY IN STORMS.