ESTUARY WAY
THE NORTH END OF THIS UNIT WAS PUSHED OUT SIGNIFICANTLY IN THE HURRICANES OF 2004. THIS STUCTURAL DAMAGE REQUIRED RECONSTRUCTION OF THE GABLE END WALL TO PREVENT REOCCURRANCE OF SUCH A DISASTER. THE WALL'S CEDAR SIDING AND WALL FRAMING STRUCTURE WAS REMOVED ON THE MORNING OF WEDNESDAY, JULY 13, 2005 AS CAN BE SEEN IN THE PHOTO.

LATER ON JULY 13TH THE BALLOON FRAMING WAS INSTALLED BY THE CARPENTERS ON THE SECOND FLOOR. PLYWOOD BRACING AROUND THE BATHROOMS WAS PUT IN PLACE AND BRACING TO TIE IN THE WALL STRUCTURE WITH THE ROOF TRUSSES WAS ADDED.