BELOW TRUCKLOAD OF PLYWOOD AND OTHER MATERIALS ARRIVES BEFORE 6:30 A.M. JULY 21st, ON ESTUARY WAY, FOR THE DAY'S WORK.
BELOW RIGHT IS A CLOSEUP OF AN H2.5R HURRICANE TIE USED TO JOIN THE VERTICAL STUDS TO THE FLOOR SOLE PLATES AND TO THE UPPER PLATES. THESE ARE BEING USED ON THE STUDS ON ALL THE WALL STRUCTURES BEING INSTALLED AT PELICAN POINTE II.
BELOW, LEFT 9660 ESTUARY HAS LOWER FLOOR GABLE END WALL SHEATHED IN PLYWOOD AND UPPER FLOOR BALLOON FRAMING HAS BEGUN.
THE BATHROOMS WERE LATER SHEATHED WITH PLYWOOD AND TIED INTO THE BALLOON WALL STRUCTURE
FOR ADDED STABILITY IN STORMS.